PreviousNext
Page 328
Previous/Next Page
Technology in Australia 1788-1988Australian Academy of Technological Sciences and Engineering
----------
Table of Contents

Chapter 6

I Construction During The Settlement Years

II The Use Of Timber As A Structural Material

III Structural Steel

IV Concrete Technology

V Housing

VI Industrialised Pre-cast Concrete Housing

VII Ports And Harbours

VIII Roads

IX Heavy Foundations

X Bridges

XI Sewerage

XII Water Engineering

XIII Railways

XIV Major Buildings

XV Airports

XVI Thermal Power Stations

XVII Materials Handling

XVIII Oil Industry

XIX The Snowy Mountains Scheme

XX The Sydney Opera House

XXI The Sydney Harbour Bridge

XXII Hamersley Iron

XXIII North West Shelf

Sources and References

Index
Search
Help

Contact us
Concrete Technology (continued)

The structure, which is one of Australia's most technologically advanced projects, is capable of resisting the force necessary to crumple a 5000 tonne barge navigating the river and dissipate its kinetic energy. Hobart, Tasmania, 1983 (Fig. 10).

Figure 10

10 Bowen Bridge, Hobart, Tasmania

The Gateway Bridge of 6-lane concrete, 1.6 km long with a 22 m wide traffic deck rising to 64.5 m above the Brisbane River, is claimed to be the longest and widest balanced-cantilever structure in the world. The 260 m central span is flanked by 145 m side spans of in situ concrete balanced cantilevers and fifteen 71 m approach spans, these being site-made 150 tonne precast deck units that are handled from beneath the bottom chord of a launching truss.

The units are held while 400 mm gaps between them are concreted to form a continuous girder, containing forty-eight stressing tendons and two hinges close to the ends of the main side spans. The central piers each rest on forty-eight bored precast concrete piles, which are extended segmentally to requisite lengths of 22 m and 52.5 m respectively with epoxy resin dowelled splices.

The central span and balanced cantilevers are of cast-in situ, single cell box segments that are 15 m deep at the piers, reducing to 5.3 m at midspan, 3 m to 5 m long and weigh up to 350 tonne. The concrete is pumped 60 m vertically to deck level, then along to the cantilever ends. Two 150 tonne travellers carry the formwork for concrete placement purposes.

To allow for subsequent creep and shrinkage, the cantilevers are jacked about 50 mm apart before being joined together at mid-river. Movements of the approaches are absorbed by three large pot bearings, both at top and bottom of the approach piers. Protection from ship collisions is provided by sheet-piled rock fill and thick independent concrete walling, Brisbane, Queensland, 1985 (Fig. 11).

Figure 11

11 Spans of Gateway Bridge, Brisbane, Queensland


[Spans not indicated are 71m]

The Melbourne Rialto project, a diagonally interconnected twin-tower complex of different height buildings up to 65 storeys tall or 250 m overall, is currently recognised as being the second tallest reinforced concrete structure in the world. It is situated on a 1 ha site where foundation considerations indicate that an existing water-table should be approximately maintained, in order to avoid settlements of adjacent buildings or the uplift of lightly loaded, raft slab areas under adverse conditions. The edifice is supported on 76 reinforced concrete caissons, 1500 mm and 1800 mm diameter, made with 40 and 45 MPa concrete and socketed into rock some 40 m below street level.


Organisations in Australian Science at Work - Civil and Civic

People in Bright Sparcs - Sunderland, W. T.; Taylor, W. H.

Previous Page Australian Academy of Technological Sciences and Engineering Next Page


© 1988 Print Edition pages 328 - 329, Online Edition 2000
Published by Australian Science and Technology Heritage Centre, using the Web Academic Resource Publisher
http://www.austehc.unimelb.edu.au/tia/328.html